Bailey’s News

News, Views and Commentary on the World of Woodcutting

Building a Cabin in Alaska Wilderness with the Logosol M5 Chainsaw Mill: Day 13

by dotcompost 27. December 2012 23:57

Cabin Building Day 13

3/7/11 

Got the last wall framed in today.

Top plates next, then start putting up siding.

Tags:

Building a Cabin in Alaska Wilderness with the Logosol M5 Chainsaw Mill: Day 12

by dotcompost 20. December 2012 18:50

Cabin Building Day 12

3/5/11 

It finally warmed up in interior Alaska

Got the second long wall done with the window openings. One more wall to go.

End view, planning on getting the last wall with door and window done on Sunday.

Loaded up the big spruce to cut some 2x4's

Big spruce with log lifts bottomed out, just able to take a small slice with the 20" bar, to big for the 16" bar.
Had to use a standard stihl chain and standard 20" bar, ordered a 20" bar and low pro rip chain from Bailey's but it has not come in yet.
For those who are wondering how the mill cuts with standard cross cut chain, it really slow and makes some big chips (lots of them)! Rip chain is way faster!
Really did not have a choice, was able to take off 4 slabs and get the log down to a 14" square cant to cut with the 16" low pro rip chain and bar.

14" cant is the max for my 16" bar, cut two 4x14" cants from center then rip the both at the same time into 2x4's, nice getting 2 stud boards with each pass.

Was able to yield 15 true 2x4's and one 1x14" from the large spruce.

 

Building a Cabin in Alaska Wilderness with the Logosol M5 Chainsaw Mill: Day 11

by dotcompost 13. December 2012 23:40

Cabin Building Day 11

2/20/11 

After not being able to go out for two weeks (temps in the -40's F) on the weekend, finally got out this weekend. Two plus feet of fresh snow so I spend most of my time digging things out and getting stuck pulling logs to the mill. Was able to get the rest of the wall beams cut and some of the walls studs for the last two walls. Planning on getting the walls finished up next weekend if its not -40!

Logging in 4' of snow, mad felling skills on the right tree, should have been a field goal kicker J

1st tree loaded up ready to head to the mill, got stuck 12 times on the way (1/4 mile), with a 24" superwide track!!!! If its not -40 its 4' of powder. Warn winch got its workout today.

Snow around floor deck, lumber for last two walls.

 

Mill after digging it out of the snow.

 

Building a Cabin in Alaska Wilderness with the Logosol M5 Chainsaw Mill: Day 10

by dotcompost 7. December 2012 00:08

Cabin Building Day 10

2/5/11 

Stayed the night at the building site in the Arctic Oven tent, temp dropped to -28 in the middle of the night. Didn't get as much done on the walls but was able to haul in a couple of trees. Got some more corner posts made along with some 2x4's and 1x7's. If the temp goes back up, planning on going back out Sunday and put up at least one more wall.

Camping out in Arctic Oven tent with woods stove, keeps thing toasty warm at -28.

Tent and Cabin.

Logs ready to mill

Logs ready to mill

 

The above log was the first one that was too big for me to cut with my 16" bar, had it loaded on the mill with the log lifts all the way down and still could not make a pass with the 16" bar. Have a 20" bar coming in the mail to take care of this one. Never thought I would max out the bar with an interior Alaska Spruce, but its possible.

Be sure to check back next Thursday for Part 11!

Tags:

About Bailey's Blog

Welcome to the Bailey's blog. We've set up our blog as a place for Bailey's employees to share news and views on a wide variety of topics with our customers and vendors. Bailey's has served the wood products, tree care and landscaping industries as well as land and homeowners for well over 3 decades. We offer a wide variety of chainsaws and outdoor power equipment, saw chain, bars, OEM and aftermarket replacement parts and 1000s of products for those who work outdoors.

Tag cloud